SUN-30K-SG02HP3-EU-AM3
High-voltage three-phase hybrid inverter baseline for preliminary project configuration.
- Builder role
- Power class selection for a preliminary enquiry.
- Technical source
- Current model-specific datasheet and installation manual.
A clean directory of the equipment ranges used throughout the system builder, project pack and quotation workflow — with manufacturer documentation kept close to the product.
Source library verification date: 2026-09-24. Manufacturer documents can change; exact supplied revision governs.
These are the model-specific Deye baselines already used by the system builder. Open the exact datasheet or manual before finalising an engineering specification.
High-voltage three-phase hybrid inverter baseline for preliminary project configuration.
High-voltage three-phase hybrid inverter baseline for preliminary project configuration.
High-voltage three-phase hybrid inverter baseline for preliminary project configuration.
High-voltage three-phase hybrid inverter baseline for preliminary project configuration.
The builder uses these families for storage planning. Energy, voltage, current, BMS communication and approved pairing all need to be checked against the exact supplied revision.
BOS-B Pro-A3 family · 16.08 kWh nominal per module
BOS-G Pro family · 5.12 kWh nominal per module
STACK280 · Africa warranty documentation available
PV is intentionally treated as an enquiry input rather than a guaranteed design. Stringing, voltage, current, roof/site conditions and inverter limits are confirmed separately.
Requested alongside inverter and battery equipment. Exact model and regional warranty document are confirmed on quotation.
Request PV pricing →Requested alongside inverter and battery equipment. Exact model and regional warranty document are confirmed on quotation.
Request PV pricing →Requested alongside inverter and battery equipment. Exact model and regional warranty document are confirmed on quotation.
Request PV pricing →The website deliberately separates product information from compatibility approval. A published voltage or capacity figure is useful for screening, but it does not by itself establish a complete inverter, battery, BMS, PV or site-compatible system.
Build a preliminary configuration →See the warranty source library, confidence labels, manufacturer documents and warranty preparation checklist in one place.
Open Technical Centre ↗